unthinkable
Case study · A telecom operator, India · national LTE network across 22 telecom circles

The operator's teams take a new network site from acquisition to engineering with every approval and budget in one system.

The operator wanted to set up new network infrastructure faster, with every stakeholder working from the same information at each stage.

India

What changed

40%faster development (as reported)
25%shorter turnaround for task completion (as reported)
2Xclearer view of development status (as reported)
What stood in the way

What stood in the way.

What stood in the way
  • Site selection, acquisition and planning involve many stakeholders at many levels, and data was lost between stages.
  • The in-house team building the system ran short of skills as the project grew.
What changed
  • 40%faster development (as reported)
  • 25%shorter turnaround for task completion (as reported)
  • 2Xclearer view of development status (as reported)
What we built

What we built.

  • A team in Angular and Java working alongside the operator's in-house developers.
  • New acquisition management: site location, infrastructure needs, approvals and budget.
  • Planning (requirements, roles, pending tasks) and engineering (layout, vendors, utilities, boards, banners, lighting), with modules made less dependent on each other.
  • Angular
  • Java
What it shows

What this work shows about us.

We work inside your team

Our developers joined the operator's own team and built modules alongside them.

We know rollout runs in stages

Acquisition, planning and engineering are separate jobs with hand-offs; the modules follow those stages.

Want to build a similar site rollout information system? Tell us what you want to change. Our AI assistant, Ask Unthinkable, helps you define your requirements, then connects you with the right team.

Start your plan ↗
If we built it today

If we built it today, with AI.

This work came before today's AI. If One of India's leading 4G network providers asked us now, this is what we would add, step by step.

Site approval

An agent would check each new site file for missing permits, budget sign-offs or engineering inputs and chase the owner of each gap. Managers still approve every site.

Status

An agent would tell each stakeholder which sites wait on them and why, from the system's own records.

Related

Where this work fits.

    Facts and figures from the project records; nothing added.

    Ask Unthinkable

    Want this for your business?

    Tell us what you run or what you're building. Our AI assistant, Ask Unthinkable, helps you define your requirements, then connects you with a senior AI engineer.

    Send us a note instead

    Required

    Thanks. A senior AI engineer will reply to you.
    u
    Ask UnthinkableClarity first, then the right team
    Your conversation

    An AI agent. This prototype uses prepared answers and sends nothing.